Fuse 1 generation, Fuse Sift, and Fuse Blast preventative maintenance overview (24-month)
Fuse 1 generation, Fuse Sift, and Fuse Blast preventative maintenance overview (24-month)
Formlabs SLS service plans include preventative maintenance visits for covered machines. This article outlines the tasks that authorized service technicians will perform at a 24-month preventative maintenance visit to maintain peak performance of a customer’s Fuse 1 generation printer, Fuse Sift, and build chambers. If you do not have a service plan, you can follow this article as a guide to maintain your own machine.
This schedule reflects a Fuse 1 generation printer and Fuse Sift that completes 2–3 prints (or 40 printing and 2–3 extraction hours) per week. Customers who, on average, complete >3 prints per week may require maintenance visits as frequently as every 18 months.
The unit should be operational and pass all priming checks at the end of maintenance. If there are any errors or issues found during or after maintenance is completed, please contact Formlabs Support.
Recommended supplies
This list should not be considered comprehensive of all work that will be required in all cases. For preventative maintenance visits done by a technician, the service representative will consult with the customer while arranging the visit to identify any additional issues that may require attention.
For customers servicing their own machines, spare parts are available for purchase on the Formlabs Store.
Fuse 1 generation units
- All units
- Replacement air intake filter (IF-FS1-01)
- Replacement air exhaust filter (EF-FS1-01)
- Recoater motor (RP-FS1-BSTEP-01)
- Quartz tube heater (RP-FS1-120-QT-01 or RP-FS1-230-QT-01)
- SKU is voltage-specific
- Two in each unit—replace both
Fuse Sift units
- All units
- Fuse Sift HEPA Air Filter (HF-FS1-01)
- 150 micron sieve (SV-FS1-01)
- Customer using Nylon 11 CF Powder or TPU 90A Powder
- 300 micron sieve (SV-FS1-02)
Fuse 1 generation build chamber
- All units
- Build chamber inner gasket (RP-FS1-VSS-01)
- Build chamber external frame gasket (RP-FS1-BG-01)
- Build chamber print bed assembly (RP-FS1-PB-01)
- Build chamber lead screw cleaning kit (RP-FS1-LSCK-01)
Fuse Blast units
- All units
- Fuse Blast HEPA air filter (RP-FB-HFTR-01)
- Dispense nozzle (RP-FB-NOZ-01)
- Fuse Blast door window (RP-FB-WIND-01)
- Fuse Blast Small Tumbler Basket Liner Kit (RP-FB-BLNE-01)
- Polishing System only
- Fuse Blast Polishing System Preventative Maintenance Kit (RP-FS1-FB-PMK-01)
Checklists
Some printers may be due for all or only a few of the standard preventative maintenance procedures. Refer to the tables below for what criteria qualifies a component or subsystem that is in need of service.
Consumables
|
Check |
Replace If |
|
|---|---|---|
|
The black plastic housing at the base and top are undamaged. Occluded pleats can be cleaned with basic vacuuming. |
|
|
The metal frame is not bent or warped and the inward-facing gasket is intact. Occluded pleats can be cleaned with basic vacuuming. |
|
|
Both gaskets are free of any cracking, tearing, chipping or localized hardening. Excessive amounts of powder do not leak from the bottom. |
|
|
The metal frame is not bent or warped and the inward-facing gasket is intact. Occluded pleats can be cleaned with basic vacuuming. |
|
|
The frame is unbent or undamaged and is fully secured into the sifter. Mesh is free of holes, frays or occlusion. |
|
|
N/A |
Recoater motor has not been replaced within the last year. |
|
N/A |
During every 24 month PM visit. |
Maintenance
|
Check |
Perform/Replace If |
|
|---|---|---|
|
All user-facing maintenance tasks on the touchscreen are at 0 hours. |
Any user-facing maintenance tasks that have more than 0 hours against them. |
|
N/A |
There are signs of recoater chatter or previous reports of recoat issues. |
|
|
|
|
N/A |
The build chamber has been used. |
|
|
Loose powder buildup and fraying felt. |
Felt is fraying or sintered powder has built up. |
|
|
Powder accumulation around the doser assembly. Occlusion of doser gear teeth with powder, powder flakes. |
|
|
|
The window is free of smudges or contamination after a single cleaning with the recommended swabs. |
|
|
|
|
Fuse Blast
|
Check |
Perform/Replace If |
|
|---|---|---|
|
All user-facing maintenance tasks on the touchscreen are at 0 hours. |
Any user-facing maintenance tasks that have more than 0 hours against them. |
|
There are no clogs or buildup inside. |
Clean out the blast gun if needed. Inspect the nozzle for wear and replace if the inner diameter has widened. |
|
Debris in the ionizer tips. Visually inspect the ionizer cable for integrity and wear. |
Clean as needed with a cotton swab. |
|
|
Line connection from nozzle to chamber wall. Internal connections followed through the whole system. |
|
|
Material flaking off and worn areas |
|
|
|
N/A |
Scratches or fogging are significantly reducing operation visibility. Visibility only affects manual cleaning. |
|
|
Water hose connection area contains the needle. |
Clean out any buildup. Replace if broken. |
|
Connection from nozzle to chamber wall. |
Replace if punctured. |