Formlabs SLS service plans include preventative maintenance visits for covered machines. This article outlines the tasks that authorized service technicians will perform at a 48-month preventative maintenance visit to maintain peak performance of a customer’s Fuse 1 generation printer, Fuse Sift, and build chambers. If you do not have a service plan, you can follow this article as a guide to maintain your own machine.
This schedule reflects a Fuse 1 generation and Fuse Sift that completes ~2–3 prints (or 40 printing and 2–3 extraction hours) per week. Customers who, on average, complete >3 prints per week may require maintenance visits as frequently as every 18 months.
The unit should be operational and pass all priming checks at the end of maintenance. If there are any errors or issues found during or after maintenance is completed, please contact Formlabs Support.
Recommended supplies
This list should not be considered comprehensive of all work that will be required in all cases. For preventative maintenance visits done by a technician, the service representative will consult with the customer while arranging the visit to identify any additional issues that may require attention.
For customers servicing their own machines, spare parts are available for purchase on the Formlabs Store.
Fuse 1 generation units
- All units
- Replacement air intake filter (IF-FS1-01)
- Replacement air exhaust filter (EF-FS1-01)
- Recoater roller unit assembly (RP-FS1-RU-01)
- Quartz tube heater (RP-FS1-120-QT-01 or RP-FS1-230-QT-01)
- SKU is voltage-specific
- Two in each unit—replace both
- Doser assembly
- Fuse 1+ 30W (RP-FS1P-DOS-01)
- Fuse 1 (RP-FS1-DOSE-01)
- Required for 230 V units
- Fuse 1 only: Fuse 1 air heater assembly (RP-FS1-230-AHTR-01)
Fuse Sift units
- All units
- Fuse Sift HEPA Air Filter (HF-FS1-01)
- 150 micron sieve (SV-FS1-01)
- Mixer assembly (RP-FS1-SMIX-01)
- Customer using Nylon 11 CF Powder or TPU 90A Powder
- 300 micron sieve (SV-FS1-02)
Fuse 1 generation build chamber
- All units
- Build chamber inner gasket (RP-FS1-VSS-01)
- Build chamber external frame gasket (RP-FS1-BG-01)
- Build chamber print bed assembly (RP-FS1-PB-01)
- Build chamber lead screw cleaning kit (RP-FS1-LSCK-01)
Checklists
Some printers may be due for all or only a few of the standard preventative maintenance procedures. Refer to the tables below for what criteria qualifies a component or subsystem that is in need of service.
Consumables
|
Check |
Replace If |
|
|---|---|---|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
N/A |
During every 48 month PM visit. |
Maintenance
| Check | Perform/Replace If | |
|---|---|---|
|
All user-facing maintenance tasks on the touchscreen are at 0 hours. |
Any user-facing maintenance tasks that have more than 0 hours against them. |
|
N/A |
Always (unless user restrictions are in place) |
|
N/A |
There are signs of recoater chatter or previous reports of recoat issues. |
|
|
|
|
If the recoater has deep gouges or buildup of melted powder after a cleaning with ethanol. |
If the component cannot be cleaned. |
|
|
N/A |
If not replaced within the printer lifetime. |
|
|
N/A |
If there is powder leaking down the side of the print enclosure. |
|
N/A |
The build chamber has been used. |
|
|
Loose powder buildup and fraying felt. |
Felt is fraying or sintered powder has built up. |
|
|
|
|
|
N/A |
Loud noises and movement issues when running the mixer |
|
|
|