Fuse 1 generation and Fuse Sift preventative maintenance overview (36-month)
Fuse 1 generation and Fuse Sift preventative maintenance overview (36-month)
Formlabs SLS service plans include preventative maintenance visits for covered machines. This article outlines the tasks that authorized service technicians will perform at a 36-month preventative maintenance visit to maintain peak performance of a customer’s Fuse 1 generation printer, Fuse Sift, and build chambers. If you do not have a service plan, you can follow this article as a guide to maintain your own machine.
This schedule reflects a Fuse 1 generation and Fuse Sift that completes 2–3 prints (or 40 printing and 2–3 extraction hours) per week. Customers who, on average, complete > 3 prints per week may require maintenance visits as frequently as every 9 months.
The unit should be operational and pass all priming checks at the end of maintenance. If there are any errors or issues found during or after maintenance is completed, please contact Formlabs Support.
Recommended supplies
This list should not be considered comprehensive of all work that will be required in all cases. For preventative maintenance visits done by a technician, the service representative will consult with the customer while arranging the visit to identify any additional issues that may require attention.
For customers servicing their own machines, spare parts are available for purchase on the Formlabs Store.
Fuse 1 generation units
- All units
- Replacement air intake filter (IF-FS1-01)
- Replacement air exhaust filter (EF-FS1-01)
- Recoater motor (RP-FS1-BSTEP-01)
- Quartz tube heater (RP-FS1-120-QT-01 or RP-FS1-230-QT-01)
- SKU is voltage-specific
- Two in each unit—replace both
- Z-motor and drive assembly (RP-FS1-ZMTR-01)
Fuse Sift units
- All units
- Fuse Sift HEPA Air Filter (HF-FS1-01)
- 150 micron sieve (SV-FS1-01)
- Customer using Nylon 11 CF Powder or TPU 90A Powder
- 300 micron sieve (SV-FS1-02)
Fuse 1 generation build chamber
- All units
- Build chamber inner gasket (RP-FS1-VSS-01)
- Build chamber external frame gasket (RP-FS1-BG-01)
- Build chamber lead screw cleaning kit (RP-FS1-LSCK-01)
Checklists
Some printers may be due for all or only a few of the standard preventative maintenance procedures. Refer to the tables below for what criteria qualifies a component or subsystem that is in need of service.
Consumables
|
Check |
Replace If |
|
|---|---|---|
|
|
|
|
|
|
|
N/A |
Quartz tubes have not been replaced within the printer lifetime. |
|
|
|
|
|
|
|
|
|
Maintenance
|
Check |
Perform/Replace If |
|
|---|---|---|
|
All user-facing maintenance tasks on the touchscreen are at 0 hours. |
Any user-facing maintenance tasks that have more than 0 hours against them. |
|
Compacted powder in gear teeth or melted powder on linear rail after a cleaning with ethanol. |
Powder found in pinion rack and along linear rail or previous reports of movement issues. |
|
If the recoater has deep gouges or buildup of melted powder after a cleaning with ethanol. |
There are signs of recoater chatter or previous reports of recoat issues. |
|
N/A |
Recoater motor has not been replaced within the printer lifetime. |
|
|
Powder and debris accumulation or any unusual movement. |
|
|
|
Metal contacts cannot be cleaned. |
|
Compacted powder on the bevel gear |
Little to no movement using Motor Moves with a build chamber installed. |
|
|
N/A |
The build chamber has been used. |
|
|
|